实用工具标记

General 实用工具标记 (for Construction/Maintenance)

当挖

When digging, contractors must hand-dig within 3 ft. 有标记的线.

打桩时

When driving stakes, such as for tents, staking must not take place 5英尺内. 在任何一边 有标记的线.

The campus has a variety of fiber, 气体, 电, 灌溉, and other underground utilities that must be protected. It is the requestor's responsibility to inform all related parties of this requirement. The Facilities Management 实用工具标记 procedure establishes the process for the marking of underground utilities (e.g. 电, sewer, water, 灌溉, pedestrian lighting, telecom/fiber, 等.).

The following information will have to be provided in order submit a request for marking a site:

  • Describe the reason for the request
  • Describe (in detail) the location of the request. Include the nearest street intersection.
  • Note the date when the marking should be completed
  • Attach a map or sk等h of the area to be marked

请注意: Utility marking is only as good as record drawings. Marking company and/or Facilities Management are not responsible for inaccurate utility drawings or resulting mismarked utilities.

3天

实用工具标记 Company | Notice required 72 hours before work is to begin

3天

小姐效用 | Notice required 72 hours before work is to begin

7天

ODU设施 | ODU设施 Management requires 1 week notice

7天

ODU的 | ODU Information 技术服务 requires 1 week notice

 

Procedure to Request General 实用工具标记

In order to request that utilities be marked on the ODU campus (including Virginia Beach Higher Education Center, Tri Cities/VMASC) the 请求者 must take the following steps:

Two currently available SWAM vendors:

This will cover ODU owned utilities:

  • Includes: Water, Electric, Gas, and Sewer
  • DOES NOT Include: Irrigation and Telecom/fiber optic lines

Requestor is responsible for:

  • Verifying vendor information (vendor is still SWAM, will take credit card, 等.)
  • Vendor has received request and can respond in required timeframe
  • Providing vendor with current utility drawing as necessary. For those without access to digital library, contact Facilities Management.

效用小姐: (811 or 1-800-552-7001)

This will cover all non-ODU owned utilities (Dominion Power, Virginia Natural Gas, 考克斯电缆, HRSD, 城市供水和下水道, 威瑞森, 等.

提交一个 电信工作单 (了解更多)

You can submit an ODU work order via FM:系统 maintenance work order system.

Request an As-Built sk等h of utilities found and send a copy to Facilities Management maintenancesupport@0933282516.com (please include work order # if applicable).

For excavations impacting any 体育运动' areas, contact the 体育运动 Department

  • Greg Smith - (757) 683-6026
  • Rick French - (757) 683-4235

成本/收费

There will be charges associated with having a site marked: (all rates subject to change)

  • Vendor charges (vary)
  • ITS收费$47.50/hr for marking telco/fiber
  • Irrigation marking rate is $55/hr.

实用工具标记 for University 事件

Event utility marking is required to ensure that University utilities are protected from the staking of tents and amusements, driving grounding stakes or other specially permitted event activities.